Based on 30 years of experience with in-situ condition assessment and QA/QC on construction sites, we are pleased to offer training of your staff, implement procedures and audit the production, thus improving your construction work with respect to:
- Better concrete
- Improved production quality
- Risk reduction
- Trouble shooting, if things go wrong
Implementation of a QA/QC system on the site, is not meant to disturb or annoy the production sections, but is essential to prevent problems in advance; by testing and evaluating all relevant aspects of the production cycle, from stockpile build-up to the final finishing of concrete surfaces. Pelcon has been successful in this.
- Concrete mix design
- In-situ surveillance
- Cracks
- Grade, surface structures, aspects etc.
- Thickness, cover-layer thickness
- In-situ survey
- AVA Air Void Analysis in Fresh Concrete
- Condition Assessment
- Cracks During Construction
- Laboratory installation
- Incorporation of traditional test methods for fresh and hardened concrete
- Advanced Testing if Relevant/Required
- Audits of Staff, Results and Actual Procedures
- Quality Plans, Work Instructions and Procedures
- Training of Laboratory Personel
- Stockpile surveillance
- Testing of fresh concrete
- Traditional Testing: Workability, temperature, density, air content
- Essential ‘new’ fresh concrete parameters’, e.g. air void structure, dispersion and micro workability if relevant/required
- Testing of hardened concrete
- Cast cubes/cylinders
- Core analysis, e.g. with respect to obtained microstructure and durability
- Training of production teams
- Finding Your Own Flaws
- Hands-on Casting
- Interplay of Vibration and Inner Structure
- The Cracking Need of Early Moisture Protection